Melbourne renovation company

Renovations Melbourne, from a single room to the whole house

We renovate whole homes, houses, laundries, pools, period homes, apartments and commercial offices across metropolitan Melbourne, on a fixed-price contract with a written scope and a staged plan. You know what is being built, what it costs, and how the house will work while the job is running.

VBA registered builder Fixed-price contracts Domestic building insurance Melbourne wide
Whole-home renovation in Melbourne with an open plan living area, timber floors and new joinery
SCOPE FIRST No surprise variations

Every inclusion, allowance and provisional sum is written down before a single wall comes out.

01  /  Who we are

What renovations do we do across Melbourne?

Renovations Melbourne is a VBA registered renovation company that renovates whole homes, houses, laundries, pools, period homes, apartments and commercial offices across the metropolitan area. We work on fixed-price contracts with a written scope and a staged plan, so you know what is happening, what it costs, and how you will live in the house while the work is on.

Most renovation enquiries we take start the same way. Someone has a house that works badly. The kitchen and living areas are cut into small rooms, the back of the house is dark, the laundry is a cupboard off the garage, and every quote they have received so far is a single number on one page with no idea what sits behind it. The job of a renovation builder is not only to build. It is to turn a rough idea into a scope precise enough that two builders quoting it would be quoting the same thing.

That is where our work begins. We measure the existing house, mark what is load bearing, check services, and put the scope in writing before pricing it. If a wall carries the roof, you find out at the quote stage and not after demolition. If the floor level has dropped 40mm across the rear addition, that goes in the scope too, with an allowance beside it. Renovating an occupied house has enough surprises without inventing new ones on paper.

We cover the full range of residential work, from a single laundry through to a full internal reconfiguration with a second storey, and we run a separate commercial arm for office and shop fitouts. Whichever it is, you deal with the builder running the site, not a sales desk that hands you over once the contract is signed. If you are still comparing companies, our guide to renovation builders Melbourne sets out the five checks worth making before you shortlist anyone.

Renovation builder in Melbourne going through drawings and a written scope with a homeowner

What you get before you commit

  • A written scope, room by room, with inclusions listed
  • Allowances and provisional sums shown separately
  • A staged program with the stages you approve and pay at
  • Confirmation of what needs a building or planning permit
  • A fixed-price contract, not a one-line estimate
8Renovation types we cover
23Melbourne suburbs served
8Stages you approve and pay at
FixedPrice, not an estimate
02  /  What we renovate

What can we renovate in your home?

Six residential renovation types, each with its own page, its own sequencing and its own risks. Pick the one closest to your project and read what the work actually involves.

Home renovation in Melbourne with an open plan kitchen and living space after removing internal walls
Whole homeMulti room

Home renovations

The full internal rework: removing walls, relocating services, re-planning the living zones and finishing the house as one project rather than five separate trades over five years. This is the work most owners mean when they say they are renovating.

Home renovations Melbourne
House renovation in Melbourne showing a reconfigured rear living area with new windows
StructuralReconfiguration

House renovations

Changing how the house itself is put together: knocking through, moving a wet area, raising a ceiling, adding a second storey or squaring off an old rear lean-to. Structural work brings in engineering, a building permit and a longer program.

House renovations Melbourne
Renovated laundry in a Melbourne home with cabinetry, benchtop and a drying area
Single roomWet area

Laundry renovations

The smallest wet area and the one most often done badly. A laundry needs the same waterproofing discipline as any other wet room, plus real thought about drying in a Melbourne winter, bench height, and where the machine sits so the door still opens.

Laundry renovations Melbourne
Renovated backyard and pool surround at a modern Melbourne home
OutdoorResurfacing

Pool renovations

Ageing concrete shells, failed interiors, tired coping and pumps that cost a fortune to run. A pool renovation covers resurfacing, retiling, new plant and often the paving and fencing around it, so the whole yard reads as one finished space.

Pool renovations Melbourne
Period home renovation in Melbourne retaining original hallway details and cornices
HeritageOverlay

Period and heritage homes

Victorian, Edwardian and interwar houses across the inner suburbs, where the front rooms are protected and the value sits in what you keep. Heritage overlays change what council will approve, so the planning path is settled before design goes far.

Period home renovations
Apartment renovation interior in Melbourne with new flooring, joinery and lighting
StrataAccess

Apartment renovations

Renovating inside a strata building is half construction and half paperwork. Owners corporation approval, common property boundaries, lift bookings, work hours and noise rules all shape the program before any trade turns up.

Apartment renovations Melbourne

Not sure which one your project is?

Most jobs cross over. A whole-home renovation usually takes in a laundry, and a period home renovation is nearly always a structural job as well. Send through what you have and we will tell you which path it sits on before you spend money on drawings.

Start with a scope
03  /  Whole home and house

What is the difference between home renovations and house renovations?

A home renovation changes how the house is used and finished. A house renovation changes the building itself. The difference decides your permit path, your engineer, your program and a large part of your budget.

Close detail of renovation materials and finishes selected for a Melbourne home renovation

Home renovations: how the house is used

This is the work that lands inside the existing shell. New joinery, new flooring, re-lining and re-wiring, replanned wet areas, better lighting and heating, and a rear living space that finally gets some north light. Walls may still come out, but the roof structure and the footprint stay largely as they are.

The gain here is daily use rather than floor area. Owners of postwar and 1970s houses across the eastern and southern suburbs get the biggest lift, because those homes were planned around small separate rooms and a single narrow hallway. Open two walls and the same house feels a third bigger without adding a square metre.

Usually needs

A building permit for most structural, plumbing and wet-area work, and licensed trades signing off their own components.

Typical run

Ten to twenty weeks on site for a multi-room project, depending on scope, access and how much of the house stays occupied.

Renovated Melbourne house exterior after a structural renovation and rear extension

House renovations: the building itself

Here the structure changes. Load-bearing walls come out and steel goes in, a rear lean-to is demolished and squared off, a ceiling is raised, a bathroom moves to the other side of the house, or a second storey goes on. Every one of those decisions brings an engineer, a building surveyor and a longer program.

Structural renovation also exposes what the original builder left behind. Stumps that have dropped, brickwork with no damp course, wiring that predates the safety switch, and roof framing sized for a much lighter roof than the one on it now. We allow for inspection and rectification instead of pretending an eighty year old house will be perfect underneath.

Usually needs

Engineering, a building permit, and a planning permit where an overlay, setback or neighbourhood character control applies.

Typical run

Longer. Structural work sits at the front of the program, so nothing else can start until the frame and the roof are closed in.

Small commercial office fitout in Melbourne with meeting room, joinery and new lighting
04  /  For business

Do you renovate offices and commercial spaces as well?

Yes. Our commercial arm handles office renovation and fitout for tenants and owners across Melbourne, from a refresh of an existing tenancy through to a full category 2 fitout in a base-building shell. It runs to a different brief from residential work, because the client is a business and the measure of success is the business trading through it.

Commercial projects are governed by the lease as much as by the drawings. Landlord approval, base-building services, make-good obligations at the end of term, after-hours access, fire and DDA compliance and a building surveyor who signs the occupancy side all sit inside the program. We price and schedule around those conditions rather than discovering them at week three.

Fitout categories

Category 1 base-building work through to category 2 tenant fitout, including partitioning, ceilings, services and joinery.

Defit and make good

Stripping a tenancy back to the landlord's schedule at end of lease, documented so the bond release is not argued.

Staged works

Programmed in zones or out of hours so staff keep working and the business does not shut for the duration.

Compliance

Access, egress, fire services and essential safety measures coordinated with the building surveyor from the start.

05  /  Budget

What does a renovation cost in Melbourne?

Renovation cost is driven by three things: how much structure changes, how much wet area is involved, and how hard the site is to work on. The table below gives the honest working ranges we see across Melbourne in 2026. Treat them as planning ranges, not quotes.

Indicative 2026 Melbourne ranges for planning only. Final price depends on scope, structure, access and finishes, and is confirmed after a site measure.
Renovation typeTypical rangeWhat moves the number
Laundry renovation$12,000 to $28,000Relocating plumbing, cabinetry run, whether the floor is re-waterproofed
Single-room cosmetic refresh$15,000 to $45,000Flooring, lining, joinery, lighting, and how much re-wiring is triggered
Multi-room home renovation$120,000 to $300,000Number of wet areas, wall removal, service relocation, finish level
Whole-home renovation$300,000 to $650,000+Structural change, roof works, rewire and replumb, external works
Structural house renovation$350,000 to $800,000+Steel, footings, second storey, planning permit, engineering
Period home renovation$280,000 to $700,000+Heritage requirements, restoration trades, underfloor and damp works
Apartment renovation$60,000 to $220,000Owners corporation conditions, access and hoisting, waterproofing
Pool renovation$18,000 to $90,000Interior finish chosen, tiling, plant and filtration, paving and fencing
Office fitout$900 to $2,400 per m²Category of fitout, services, partitioning, joinery, after-hours works

Why two quotes for the same house can differ by a hundred thousand

Almost always, because they are not quoting the same job. One has allowed for re-stumping and a full rewire, the other has assumed both are fine. One has priced tiling at a real allowance, the other at a figure nobody can buy tile for. One has a provisional sum for the rear drainage, the other has left drainage out entirely and will raise it as a variation once the slab is exposed.

The way to compare is to make every builder quote the same written scope, then read the exclusions before the total. A quote with a long exclusions list and a short inclusions list is a low number that will not hold. Our full breakdown by project type is in the renovation cost Melbourne guide, and there is a longer piece on why the cheapest renovation quote usually costs the most.

Three costs owners routinely forget

  • Making good the rest of the house. New floor levels meet old ones, and cornices, skirting and door heights all need reconciling at the junction.
  • Services you cannot see. Switchboard upgrades, water pressure, sewer falls and gas line sizing surface once linings come off.
  • Living costs during the build. Rent, storage, or a temporary kitchen. These are real project costs even though no builder invoices them.
WORKED EXAMPLE

Where the money goes on a whole-home renovation

Proportions from a typical Melbourne project. Percentages, not invented dollar figures, because every house is different.

  1. Demolition and structure, about 20 percent. Strip out, steel, footings, framing corrections.
  2. Services rough-in, about 15 percent. Plumbing, electrical, heating and cooling, data.
  3. Wet areas and waterproofing, about 15 percent. The highest risk trade in the whole job.
  4. Joinery and fit-off, about 22 percent. Cabinetry, benchtops, doors, tapware, fixtures.
  5. Finishes, about 18 percent. Flooring, tiling, painting, lighting.
  6. Preliminaries and margin, about 10 percent. Site management, insurance, scaffold, waste, supervision.

If a quote has no preliminaries in it, someone has either absorbed them or forgotten them. Neither is good news for you.

06  /  Scope

Is your project a structural or a cosmetic renovation?

This is the first question we ask, because the answer changes the permit path, the trades, the insurance and the timeline. It is also the question most quotes skip.

ACosmetic renovation

Nothing that holds the house up is touched. You are replacing what you can see and, usually, what sits directly behind it: flooring, wall linings, paint, joinery, tapware, lighting and window furnishings.

  • No load-bearing walls removed and no new openings in structure
  • Wet areas usually stay where they are, so drainage is untouched
  • Often no building permit, though electrical and plumbing still need licensed trades and compliance certificates
  • Shorter program, and often possible to stage room by room while living in
  • The risk is finish quality and sequencing rather than engineering

Cosmetic does not mean cheap or simple. A high-specification cosmetic renovation with imported tile and custom joinery can cost more than a modest structural one. It just carries a different risk profile.

BStructural renovation

The building changes shape or the way it carries load changes. Walls come out, openings are formed, a floor is dropped, a ceiling is raised, or a storey goes on. An engineer specifies the members and a building surveyor issues the permit.

  • Load-bearing walls removed with steel beams and new footings under posts
  • Building permit required, plus a planning permit where an overlay applies
  • Existing conditions matter: stumps, footings, damp course, roof framing
  • Longer program, because nothing follows until the frame is closed in
  • Domestic building insurance applies on residential contracts over the threshold

Most real Melbourne renovations are a mix. A rear knock-through is structural, the bedrooms around it are cosmetic, and the price you are quoted should show which parts are which. There is a full explainer in our post on structural and cosmetic renovation.

Overhead view of a whole-home renovation in progress at a Melbourne property

A renovation is bought on a drawing and delivered on a program. Both should be written down before anyone starts.

07  /  Approvals

Do you need a permit to renovate in Melbourne?

Usually yes for anything structural, and sometimes yes for work that looks cosmetic. There are two different permits and they do different jobs, which is where most confusion starts.

01

Building permit

Issued by a registered building surveyor, private or municipal. It confirms the work complies with the National Construction Code and the relevant Australian Standards. You can check any builder or surveyor on the Victorian Building Authority register. Required for structural change, new wet areas, decks over a set height, re-stumping, and most work that alters the building fabric.

02

Planning permit

Issued by your council under the planning scheme. It deals with the use and appearance of the land rather than the construction. Triggered by heritage overlays, neighbourhood character controls, setback and site coverage rules, significant landscape overlays, and some second-storey work.

03

Owners corporation approval

For apartments and units, the owners corporation controls common property and building rules. Flooring acoustic ratings, wet-area waterproofing, works hours, lift protection and where waste goes are all set by the OC, and approval comes before the building permit.

Heritage overlay work is a planning question first

If your house sits in a heritage overlay, which is common through Kew, Hawthorn, Camberwell, Northcote, Coburg, Yarraville and much of the inner ring, the front form and roofline are usually protected while the rear is where change is allowed. Settle the planning path before paying for detailed design, because a rear-focused scheme almost always approves faster than one that alters the street elevation. Our guides cover renovating in a heritage overlay and when a renovation permit is required.

Period home renovations
08  /  Process

How does a renovation run from first drawing to handover?

Eight stages. You approve at the end of each one, and you pay against completed stages rather than against a calendar.

STAGE 01

Site measure and brief

We measure the existing house, note what is load bearing, check services and levels, and write down what you actually want changed rather than what a template says.

STAGE 02

Concept and feasibility

A workable layout tested against the budget, the structure and the planning controls on your title. If something will not get approved, you find out here.

STAGE 03

Scope and fixed price

The written scope, inclusions, allowances and provisional sums, priced. This is the document you can hand to another builder and get a comparable number back.

STAGE 04

Permits and contract

Engineering, building permit, planning permit where needed, and the signed contract with the payment schedule and defects liability set out.

STAGE 05

Demolition and strip out

Protection goes down, services are isolated, and the house is stripped back. This is when hidden conditions appear, and when honest builders raise them in writing.

STAGE 06

Structure and rough in

Steel, framing, footings, then plumbing, electrical and heating rough-in, inspected before anything is closed up. Waterproofing follows to the wet-area standard.

STAGE 07

Lining, joinery and finishes

Plaster, tiling, cabinetry, benchtops, flooring and paint, in the order that stops one trade damaging the last one's work.

STAGE 08

Fit off, defects and handover

Tapware, fixtures, hardware, the walk-through defect list closed out, compliance certificates and warranties handed over with the keys.

09  /  Living in

Can you live in the house while it is being renovated?

Often yes, and it is a decision worth making with real information rather than optimism. It depends on whether the wet areas are being done at once, whether the power and water need isolating, and how much of the house can be sealed off.

01

Sealed zones

Dust walls with zips, taped floor protection and a separate trade entry keep the working half of the house apart from the lived-in half. Dust is the complaint that ruins renovations, and it is controllable.

02

One working wet area

If there is a second bathroom or an old laundry tub, we sequence so one stays live. Where there is only one, staging the wet area work is usually cheaper than six weeks of accommodation.

03

A temporary kitchen

A bench, the old sink reconnected, the fridge and a portable cooktop in a spare room costs very little and removes months of takeaway. We set it up as part of the program, not as an afterthought.

04

Known noisy weeks

Demolition, jackhammering and cutting concrete are flagged in the program in advance so you can plan around them, work elsewhere, or move out for the fortnight that actually warrants it.

For projects that involve the full ground floor at once, moving out for a defined period is usually faster and cheaper overall, because trades work continuously instead of packing down each afternoon. We will tell you which one your job is. There is more in our guide on living through a renovation.

10  /  Money and paperwork

How is a renovation quoted and contracted?

On a written scope, a fixed price, a staged payment schedule and a contract that names what happens when something changes. Here is what each of those terms means in practice.

FIXED PRICE

A price, not an estimate

A fixed-price contract locks the cost of everything defined in the scope. It does not stop the price changing if you change the scope, and no honest builder claims otherwise. It does stop the price drifting for work that was always going to be needed.

PROVISIONAL SUM

Work that cannot be priced yet

Used where the extent is genuinely unknown until something is opened up, such as drainage under a slab or the condition of stumps. It is estimated, then adjusted to the real cost with evidence. A quote with everything in provisional sums is not a fixed price at all.

PRIME COST

Items you have not chosen

An allowance for a product not yet selected, such as tapware or tiles. If your selection costs more, the difference is charged. Realistic prime cost items are a sign of an honest quote. Low ones are a sign of a number engineered to win.

PROGRESS PAYMENTS

Paying against completed stages

Payments are tied to stages that are finished and inspected, not to dates on a calendar. Under Victorian domestic building rules the deposit is capped and the schedule must be set out in the contract before work starts.

VARIATIONS

Changes, in writing, before they happen

Any change to the scope is documented with its cost and its time effect, and signed before the work is done. Verbal variations are the single most common cause of renovation disputes in Victoria.

INSURANCE

Domestic building insurance

Required on residential building work over the statutory threshold set by the VBA, taken out by the builder in your name before the deposit is paid. Ask to see the certificate. It protects you if the builder cannot complete the work.

11  /  Where we work

Which Melbourne suburbs do we renovate in?

Across metropolitan Melbourne, with most of our work in the established east, the inner north, bayside and the south east. The housing stock changes a lot between them, and so does the renovation.

Period stock, inner ring

Kew, Hawthorn, Camberwell, Northcote, Coburg and Yarraville are dominated by Victorian, Edwardian and interwar houses, many inside heritage overlays. The work is usually restore the front, rebuild the back.

Postwar and 1970s, middle ring

Bentleigh, Doncaster, Blackburn, Oakleigh and Glen Waverley have solid brick houses on generous blocks with poor internal planning. Opening them up gives the biggest gain per dollar spent.

Bayside and growth corridors

Brighton, Hampton and Sandringham bring pools, outdoor living and salt exposure into scope. Werribee, Craigieburn and Epping are newer stock where whole-home updates and reconfiguration lead.

12  /  Why us

Why choose these renovation builders in Melbourne?

Six things you can check before you sign anything, rather than six adjectives you cannot.

01

Registered and insured

VBA registered, ABN registered, HIA member, with domestic building insurance taken out in your name on qualifying residential work. Every certificate is available before you pay a deposit, not after.

02

Scope before price

We will not hand over a single-number quote. You get a room-by-room scope with inclusions, exclusions, allowances and provisional sums listed, so the price is attached to something you can read.

03

One builder, start to finish

The person who measures your house is the person running the site. Nothing is handed to a project coordinator who has never seen the job, and you are not repeating yourself to a new contact every month.

04

Structure taken seriously

Engineering, footings and existing conditions are assessed before pricing. We would rather tell you at quote stage that the stumps need doing than raise it as a variation once the floor is up.

05

Wet areas done to standard

Waterproofing is the failure that costs the most to fix later. Substrates, falls to waste, bond breakers and penetrations are done to the wet-area standard and documented, on every laundry, bathroom and balcony we touch.

06

Residential and commercial, kept separate

Homeowners and businesses need different things. Our commercial fitout work runs on its own program and its own compliance path so neither client type gets squeezed into the wrong process.

13  /  Proof

Can we see renovation projects and reviews?

Yes, and we will only ever show you our own. Renovation is sold on before and after photographs, which is exactly why so many sites use somebody else's.

Renovation plans, finish samples and a tape measure laid out for a Melbourne renovation project
Close texture of renovation wall finish used in a Melbourne home renovation
Fine material texture sample from a Melbourne renovation finishes selection

Our before and after gallery is being built as projects complete

We are a young brand and we would rather say that than fill a page with stock photography and pass it off as our work. As each renovation reaches handover, the full set goes up on the projects page with the suburb, the scope, the duration and what changed structurally. If you want to speak to owners of projects already finished, ask and we will put you in touch directly.

14  /  Plain guide

What else should you know before you renovate?

The things that decide whether a renovation goes well, written plainly. None of it is secret, but very few quotes mention any of it.

Renovate or rebuild

If more than roughly half the existing structure is coming out, rebuilding is often the better value, because you stop paying to work around old footings, old levels and old services. The case for renovating gets stronger when the house has good bones, a heritage front worth keeping, or a site where a new build would trigger tougher planning controls. We give you a straight read on which side your house falls, even when the answer is not the job we would quote. There is a longer piece on deciding between renovating and rebuilding.

Why old houses cost more to open up

A 1920s weatherboard was built to a different set of rules. Wall studs sit at spacings no longer used, ceiling joists often carry roof load they were never meant to, and there may be no bracing as we would define it now. Once you remove a wall, an engineer has to make the remaining structure work as a whole, which is why a knock-through in an old house costs more than the same opening in a 1990s brick veneer.

Where the time actually goes

Owners expect demolition and framing to be slow and they are usually fast. The slow parts are approvals at the start, selections in the middle, and fit-off at the end. Tapware on a twelve-week lead time will hold up a finished bathroom just as effectively as a structural problem. We lock selections early for exactly this reason and flag every long-lead item at contract stage.

Waterproofing is not a finish

It is a system: the right substrate, correct falls to the waste, bond breakers at every junction, sealed penetrations, a proper cure time and a compliance certificate at the end. Failed waterproofing is the most expensive defect in residential renovation because fixing it means removing everything installed on top. Any wet area we build follows the Australian wet-area standard and is documented.

Energy performance is worth doing while walls are open

The cheapest time to insulate, seal draughts, upgrade glazing and run new heating is when the linings are already off. Adding it later costs several times more for the same result. On a Melbourne house that means wall and ceiling insulation, better windows on the south and west, and sealing the gaps around downlights and exhaust fans that quietly vent your heating into the roof.

Storage is the thing owners regret

Open-plan renovations remove walls, and walls are where storage lived. Plan the replacement before demolition: a joinery run along the new living wall, a proper linen cupboard, a laundry that holds cleaning gear, and somewhere for bikes and tools that is not the new living room. It costs far less inside the main contract than as a retrofit two years on.

Site access changes the price

A narrow side path, no rear lane, a steep drive or a shared driveway all mean material goes in by hand and waste comes out the same way. On inner-suburb blocks in Northcote, Yarraville or Hawthorn this can add real cost and time, and it is a fair thing for a builder to price. It is not fair for it to appear as a surprise after the contract is signed.

Getting your money's worth from a designer

A good renovation design pays for itself by avoiding structural work you did not need. Moving a wet area two metres to line up with existing drainage, or keeping one wall to avoid a second beam, saves more than the design fee. Bring a builder into the conversation early enough to price options while they are still drawings rather than after the documentation is finished.

What defects liability means for you

After handover there is a defined period in which the builder returns to fix defects at no cost. Use it. Walk the house at three months and again before the period ends, list anything that has moved, cracked or stopped working, and send it in writing. Plaster cracking at junctions and door adjustment after a season of Melbourne humidity are normal and are covered.

Renovating for resale is a different brief

If the plan is to sell within a couple of years, the spend should follow what buyers in that suburb pay for, and stop there. In bayside that is usually outdoor living and a working pool. In the established east it is a functional family layout and a kept period front. Over-specifying finishes rarely returns its cost, while poor planning always shows in a walkthrough.

15  /  Questions

Renovation questions Melbourne owners ask

Short, direct answers to what comes up most often on a first call.

How long does a renovation take in Melbourne?

A single room takes two to five weeks on site, a multi-room home renovation ten to twenty weeks, and a whole-home or structural renovation six to twelve months. Add approvals before any of that: a building permit typically takes a few weeks, and a planning permit for a heritage or overlay site can take several months. The on-site figure is the part builders quote, so ask for the approval time as well.

Do I need a building permit to renovate?

Yes for most structural work, new or relocated wet areas, re-stumping, decks above a set height and anything altering the building fabric. Simple cosmetic work such as painting, flooring and replacing joinery in place usually does not need one, though electrical and plumbing still require licensed trades and compliance certificates. A registered building surveyor makes the call, and we confirm the permit path in writing before the contract.

What is the difference between a fixed-price contract and an estimate?

A fixed-price contract locks the cost of the scope described in it, and can only change through a signed variation or the adjustment of a stated provisional sum. An estimate is an opinion with no obligation behind it. If a builder gives you a number without a written scope attached, you have an estimate, whatever the document is titled.

Can you renovate a house in a heritage overlay?

Yes, though the planning path comes first. Heritage overlays generally protect the original street-facing form, roofline and detail, while allowing significant change at the rear where it is not visible from the street. Councils across the inner and eastern suburbs apply this differently, so we test the concept against the specific overlay before design goes into detail. Our period home renovations page covers it in full.

How much deposit does a renovation builder take?

Victorian domestic building law caps the deposit on residential building work, and the cap is lower for larger contracts than for small ones, as set out by Consumer Affairs Victoria. Payments after that are made against completed and inspected stages set out in the contract, never as a lump sum up front. If a builder asks for a large deposit before any work begins, treat it as a warning sign.

Do you handle design as well as construction?

Yes. We can take a project from a first sketch through concept, documentation, permits and construction, or we can price and build a design your own architect or building designer has produced. If you already have drawings, we will review them for buildability and cost before quoting, because catching an expensive detail on paper is a great deal cheaper than catching it on site.

What is a provisional sum and why is it in my quote?

A provisional sum is an allowance for work whose extent cannot be known until something is opened up, such as drainage under a slab or the state of the stumps. It is estimated at quote stage and adjusted to the actual cost, with evidence, once the work is exposed. A small number of realistic provisional sums is normal. A quote built mostly from them is not a fixed price.

Do you renovate apartments as well as houses?

Yes. Apartment renovation runs on the owners corporation rules as much as the building code, so approval, acoustic requirements for flooring, waterproofing standards, work hours, lift protection and waste removal are all agreed before we start. We handle that approval process rather than leaving it with you. Details are on our apartment renovation page.

What warranty comes with the work?

Residential building work in Victoria carries statutory warranties, backed by domestic building insurance on contracts over the threshold, plus a defects liability period written into the contract during which we return and fix defects at no cost. Manufacturer warranties on appliances, tapware and finishes are handed over at completion along with the compliance certificates.

How do I compare renovation quotes properly?

Give every builder the same written scope, then compare exclusions before totals. Check that each quote includes structural allowances, waterproofing, making good, site protection, waste and preliminaries, and check the prime cost items are set at figures you could actually buy at. The lowest number is usually the one missing the most. Our guide to comparing renovation builders sets out the checks in order.

Do you do office and commercial renovations?

Yes, through a separate commercial arm. We handle office fitout and commercial renovation for tenants and owners, including defit and make good at end of lease, staged works so a business keeps trading, and compliance coordination with the building surveyor. Pricing for commercial work is usually per square metre by fitout category. See office and commercial fitout.

What areas of Melbourne do you cover?

Metropolitan Melbourne, with most projects in the established east, the inner north, bayside and the south east. That includes Brighton, Kew, Hawthorn, Camberwell, Balwyn, Doncaster, Bentleigh, Northcote, Coburg, Preston, Sandringham and the surrounding suburbs. If your suburb is not listed, ask, because the answer is usually yes for anything inside metropolitan Melbourne.

Next step

Get a fixed-price quote for your renovation

Tell us the suburb, the type of renovation and roughly what you want changed. We will come back with the questions that actually matter, arrange a site measure, and put a written scope and a fixed price in front of you before you commit to anything.

VBA registered ABN registered Domestic building insurance Residential and commercial